Stress test scheduled?

Discussion in '2006 Archive' started by Deacon, May 5, 2006.

  1. Deacon

    Expand Collapse
    Well-Known Member

    Aug 23, 2002
    Likes Received:
    Due to a technical issue one of the two nuclear generators of molybdenum-99 in the U.S. was shut down last week.
    As of May 4th, 2006 the reactor was operational but due to the shutdown there will be a very limited amount of technetium (Tc99m) (the product used in most nuclear stress tests) over the next week.

    Many labs are quickly changing to an old product, Thallium, but image quality is much poorer and due to lack of practice, physician technical ability to scans may be lacking.

    If you need a nuclear stress test over the next week, check with your physician and the lab performing the service.

    If your study is a routinely scheduled appointment (not due to any symptoms) you may be better off waiting until the shortage is over.


Share This Page